The newest stretch of South Veterans Parkway opened this month. It runs east from Cliff Avenue, crosses the BNSF tracks, and has signals at Southeastern Avenue and Sycamore Avenue, with pedestrian underpasses on both sides of Southeastern. The City opened it to traffic in both directions on Nov. 6. Sioux Falls Live reported that the opening finished construction work that began in March 2025. You can now drive the parkway from Western Avenue through Minnesota and Cliff to Sycamore without leaving it.
For anyone looking at a lot on the south side, the new pavement is easy to misread. The road marks out where Sioux Falls is growing. When homes can go up next to it is a separate question, and the answer comes from a sewer project running on its own calendar along Highway 106, south of the parkway.
The Road Arrived First
The parkway has opened in pieces. North Veterans Parkway opened in 2020, and the Western to Cliff segment opened in November 2024. The next piece runs from Sycamore Avenue to just north of 57th Street. John Riley Construction won that contract in late October, and the City lists substantial completion for November 2028. Principal engineer Mike Heiberger told KELOLAND News that dirt work could start this fall if weather allows, with most of the construction in the spring. That segment will also bring Highway 11 into the parkway at 69th Street. The last segment, I-29 to Western Avenue at the Tea interchange, is scheduled for construction in 2028 and 2029.
Pavement brings traffic counts, signals and a route people learn to use. A house also needs sanitary sewer, and for years the south side has not had it.
The Pipe Follows Highway 106, Not the Parkway
When Kelly Construction announced its large Harrisburg development in June 2025, company president Kyle Kelly told SiouxFalls.Business that residential construction "has been nearly frozen on the south side of Sioux Falls for the past five years due to the lack of sanitary sewer access."
The City's answer is the Southeast Basins Sanitary Sewer Extension, a gravity sewer, forcemain and pump station designed to serve the southeast for the next 100 years. Its study area runs from the current city limits south to County Road 106, also called 271st Street, and from I-29 east to Highway 11. Construction was planned to begin in mid-2026, then continue in phases to final completion in 2030.
The first trunk work is going in along Lincoln County Highway 106, at the south end of that area. As of the City's Nov. 2 project update, Lidel Construction had finished the casing under the BNSF tracks and the Cliff Avenue crossing on Phase 1A, which runs from Cliff Avenue to Southeastern Avenue. Phase 1B, Minnesota Avenue to Cliff, and Phase 1C, Western to Minnesota, are both listed for 2027 construction. The City puts the contract's value at $10,299,263.38 and lists a completion date of Oct. 29, 2027.
The phases matter for buyers because the land between the parkway and Highway 106 depends on that trunk line. The road over that land is open today. The sewer it needs is still being built in 2027 sections, and the full system is not scheduled to be done until 2030.
What Two Years Did for the Western to Cliff Stretch
The Western to Cliff segment has been open for two years, so it shows how this plays out. SiouxFalls.Business reported that The Parkwood opened at 85th Street and Western Avenue in 2024. In February 2026, the same outlet reported that Qdoba planned a 2,000-square-foot location with a drive-through at 81 Gardens, near 81st Street and Minnesota Avenue.
At 85th Street and Cliff Avenue, about 160 acres on the southeast corner were on the market as raw development land this past April, according to a SiouxFalls.Business site spotlight. The listing broker quoted there described the area as held back by missing infrastructure and said the City planned to bring sewer to it within three to five years. So two years after the road opened, the biggest tract at one of its main intersections was still waiting for sewer. Nothing had been built on it.
The newly opened Cliff to Sycamore stretch is likely to follow the same pattern. Expect easier drives to the south side this winter. New subdivisions directly along the parkway are a later story, tied to when sewer reaches them.
Where a Lot Can Be Built On Now
The south and southeast edge does have neighborhoods where lots are selling and homes are going up today.
Allura, on the Harrisburg side. Kelly Construction announced this project in June 2025 as Artessa: 300 acres along a mile of Louise Avenue between Highway 106 and 272nd Street, at the southeast corner of the Louise and Highway 106 roundabout, across from Bakker Crossing Golf Course. The first phase was planned at 47 lots, mostly single-family, on parcels of a quarter acre to three-quarters of an acre. Kelly now markets the same location as Allura. The development site says each lot is stubbed for Harrisburg sewer and Lincoln County Rural Water, and that 17 lots have sold and four homes are going up. It also says St. John Paul II is coming to the development. Allura's site plan, dated Nov. 9, 2026, lists lot prices from $119,900 to $299,900. You can build here now because the sewer comes from Harrisburg's system.
SouthLoop, at 69th Street and Sycamore Avenue. In April, Empire Cos. said it was moving ahead with the next phase of townhomes and twin homes in SouthLoop. The 69th Street intersection is where the Sycamore to 57th segment will connect Highway 11 to the parkway. SouthLoop owners will be close to that work from 2027 through 2028, and close to the finished connection after that.
Empire's 57th Street tract. Empire also has a 75-acre development opening off 57th Street between Highway 11 and Six Mile Road, with single-family homes, villas, townhomes and twin homes planned. Farther west on 57th Street, at Veterans Parkway, SiouxFalls.Business reported that Good Samaritan Society's Founder's Crossing campus started construction in 2025. Its plans include a Sanford clinic and a Lewis Drug store on the remaining 30 acres by 2028. On the east side, the services and the parkway connection are arriving close together.
What Lots Cost on the Edges That Already Have Sewer
The south side's waiting period is one reason buyers who want to build now look at other edges of the metro. Prices there vary widely. At The Sanctuary, a 200-acre neighborhood in northeast Sioux Falls, the average list price across all lots was $333,000 this spring. The neighborhood sold about 15 lots a year over the previous two years, and 120 of its 160 lots remained. At Mapleton Highlands near Mapleton Golf Club, Van Buskirk Cos. reported 44 of the first 66 lots sold as of April. Lots there generally ran $150,000 to $275,000, and more than $550,000 along the golf course.
Measured against those, Allura's range of $119,900 to $299,900 sits at the low to middle end for new lots around the metro. Builders were also working through less construction this year. The City counted 604 single-family homes and townhomes under construction on April 1, 2026, down from 821 a year earlier. For a lot buyer, that means more of a builder's attention and fewer competing projects. Our earlier look at how 2025's townhome boom left extra attached supply under $400,000 covers the same slowdown from the resale side.
Jesse Deffenbaugh of Deffenbaugh Homes told SiouxFalls.Business that as the east side matures and the Veterans Parkway corridor is completed over the next several years, "I think we're going to see good growth in that whole corridor." The parkway's schedule puts the end of that period in 2029, and the sewer's schedule puts it in 2030.
The South Side Calendar
In order, here is what is scheduled between now and the end of the decade:
- Spring 2027: most construction on the Sycamore to 57th parkway segment begins.
- 2027: Southeast Basins sewer Phases 1B and 1C go in along Highway 106 from Western Avenue to Cliff Avenue, with an Oct. 29, 2027 completion date on that contract.
- 2028: the Sanford clinic and Lewis Drug at Founder's Crossing are planned. Sycamore to 57th reaches substantial completion in November.
- 2028 to 2029: the I-29 to Western segment is built and the parkway is complete.
- 2030: the Southeast Basins sewer extension reaches final completion.
If you want to start building in the next year or two, look at lots that are selling and building now: Allura on Harrisburg's sewer system, Empire's southeast neighborhoods, or the established developments on other edges of the city. Land directly between the parkway and Highway 106 is a later purchase that depends on the sewer schedule.
Questions Lot Buyers Ask About the South Side
Does living near the new parkway segment mean more construction nearby? Through 2028, yes, for the east end. The Sycamore to 57th work starts next spring, and the 69th Street connection to Highway 11 is part of it. The Cliff to Sycamore stretch itself is finished.
Is Allura in Sioux Falls or Harrisburg? It is on Louise Avenue at Highway 106, on the Harrisburg side, and its lots are served by Harrisburg sewer. The developer describes the location as between the two cities, within a mile of the future parkway. Our Harrisburg page covers the wider community.
If you are weighing a south-side lot against one that is ready to build on today, CORE Real Estate can go through the sewer, road and builder timelines for that parcel and show you lots from the CORE Lot Store next to it. When you have chosen a site, our design service can start drafting the house to fit it.